nanoFIP Test Board News

nanoFIP Test Board

12-04-2011: 20 V2 cards received

20 NFTC boards pre-validated at HLP have been received and are now being tested

nanoFIP Test Board

21-03-2011: V2 prototype validated

Two V2 test boards were received by HLP on Tuesday 15th March. HLP validated them and shipped one board to CERN; it was received on Friday March 18th. At CERN the test board has been tested in memory loopback mode, 124 bytes, 5ms macrocycle and has performed more than 42.

nanoFIP Test Board

08-03-2011: 20 test boards ordered

Twenty NanoFIP test boards are ordered. These boards will be an improved version of the prototype that is working since July 2010. This version has more test points and can also be used to test the foreseen JTAG programming extension of the NanoFIP.

nanoFIP Test Board

28-09-2010: Production and consumption of variables working

The production and consumption of variables is working and has been tested for over two days. The data is not yet checked continuously, we’re waiting for an extension of the firmware of the NanoFIP test board that allows the NanoFIP to resend the data it has received.

nanoFIP Test Board

30-08-2010: Presence and id variables read

See http://lists.ohwr.org/sympa/arc/nanofip-test-board/2010-08/msg00000.html

nanoFIP Test Board

22-07-2010: Test board validated

The test board and the software has been validated. It is now ready to accept the first version of the NanoFIP code to start testing the WorldFIP functionality.

nanoFIP Test Board

01-07-2010: steady progress

The assembly of the boards started and the firmware development is progressing. A Draft software manual is available with screenshots that give a good impression of the look-and-feel.

nanoFIP Test Board

10-06-2010: PCB layout OK. Prototype building starts.

The PCB layout has been verified and is OK. The PCB boards and all components are ordered and will arrive end of June at the company. As next step the firmware will be written.

nanoFIP Test Board

25-05-2010: New PCB layout received

We received a new layout that should include changes requested after the PCB layout review. It will be verified before launching the production of the prototypes.